有時方管坯會出現(xiàn)分層問題,從而導(dǎo)致探傷不合。要預(yù)防這一缺陷,我們可以采取以下三點處理措施:(一)優(yōu)化緩冷時間:優(yōu)化方管板坯的緩冷工藝,主要針對堆垛溫度和堆垛持續(xù)時間。軋制鋼板厚度不大于80mm鋼板熱矯直后,在冷床停留時間不得超過5min。厚度大于80mm鋼板可適當(dāng)延長至10min,確保鋼板成垛前溫度控制在500℃以上。鋼板厚度不大于50mm鋼板緩冷時間在12h;厚度大于50mm的鋼板緩冷時間24h,嚴禁提前拆垛精整。
Sometimes the stratification of square billet will occur, which will lead to incompatibility of flaw detection. To prevent this defect, we can take the following three measures: (1) Optimizing slow cooling time: optimizing slow cooling process of tube slab, mainly for stacking temperature and stacking duration. After hot straightening, the residence time in the cold bed should not exceed 5 minutes for the rolled steel plate whose thickness is not more than 80 mm. Thickness of steel plate over 80 mm can be appropriately extended to 10 minutes to ensure that the temperature of steel plate before stacking is controlled above 500 C. The slow cooling time of steel plate with thickness less than 50 mm is 12 hours; the slow cooling time of steel plate with thickness greater than 50 mm is 24 hours. It is strictly forbidden to disassemble and stack in advance.
(二)優(yōu)化控制冷卻
(2) Optimizing Controlled Cooling 方管板坯出現(xiàn)貝氏體一般是由于冷速過快造成的。當(dāng)冷卻速度降低至3-5℃/s時,鋼板心部偏析帶不再出現(xiàn)貝氏體組織,形成常規(guī)的珠光體組織??刂评鋮s優(yōu)化后,板坯心部偏析帶組織應(yīng)力明顯減少,因組織應(yīng)力產(chǎn)生的微裂紋得到大大改善。
Bainite in square tube slab is usually caused by too fast cooling rate. When the cooling rate is reduced to 3-5 C/s, the bainite structure is no longer present in the segregation zone of the steel plate core, and the conventional pearlite structure is formed. After controlled cooling optimization, the microstructural stress of segregation zone in the center of slab decreases obviously, and the microcracks caused by microstructural stress are greatly improved.
(三)集中裝爐制度
(3) Centralized charging system
在實際生產(chǎn)中軋制鋼板的長及寬相差較大,在鋼板緩冷時存在堆垛不整齊的情況,導(dǎo)致超寬板邊部探傷檢驗不合格或是超長板頭部探傷檢驗不合格。通過建立集中裝爐制度,安排軋制鋼板長、寬相近的合同集中裝爐,保證后續(xù)鋼板堆垛的整齊。必要時對方管板坯周邊采用石棉布包裹,加強保溫效果。
In actual production, the length and width of rolled steel plate are quite different. When the steel plate is slowly cooled, there is irregular stacking, which results in unqualified edge inspection or head inspection of ultra-wide plate. By establishing the centralized charging system, arranging the contract centralized charging of rolling steel plate with similar length and width to ensure the orderliness of subsequent stacking of steel plate. When necessary, asbestos cloth is used to wrap around the square tube slab to enhance the insulation effect.